Skip to content

Kernel panic – not syncing: Out of memory and no killable processes

By Franck Pachot

.
This is a quick post to give a solution (maybe not the best one as this was just quick troubleshooting) if, at boot, you see something like:

Trying to allocate 1041 pages for VMLINUZ [Linux=EFI, setup=0x111f, size=0x41108d01]

and then:

Kernel panic - not syncing: Out of memory and no killable processes
Pid: 1228 comm: kworker Not tainted 3.8.13-118.17.4.el6uek.x86_64 #2

IMG_E5543
If you do not see the messages, then you may need to remove the ‘quiet’ option of kernel and replace it by ‘nosplash’ – this is done from grub.

So, there’s not enough memory to start the kernel. I got this from a server that had been shut down to be moved to another data center, so at first, I checked that the RAM was ok. Actually, the problem was with the configuration of hugepages (vm.nr_hugepages in /etc/sysctl.conf) which was allocating nearly the whole RAM. Probably because the setting has been erroneously changed without checking /proc/meminfo.

So, without any clue about what the problem was, I started by forcing the kernel to use 4GB (instead of getting it from hardware info). This is done by pressing any key on the GRUB menu, ‘e’ to edit, add the ‘mem=4g’. Then the boot was ok. Of course, if the server tries to start the Oracle instances, the systems starts to swap so better change also the runlevel.

This is sufficient to check the huge pages allocation and ensure that you leave enough memory for at least the kernel (but also consider also the system, the PGA, …). So don’t forget that the mem= option, usually there to give a maximum limit, may be useful also to guarantee a minimum of RAM for the kernel.

Let’s work together

Ready to operate at
the next level?

Tell us about your challenge. We’ll bring the depth, the expertise, and the Swiss precision.

Oracle Team

Oracle Team

Posts published under the Oracle Team account are collective contributions by the dbi services Oracle consultants. The practice covers the full Oracle Database lifecycle: architecture, migration and upgrade, high availability with RAC and Data Guard, backup and recovery, performance tuning, and engineered systems such as Oracle Database Appliance and Exadata. The team holds Oracle certifications up to Certified Master level and operates customer platforms under service level agreements.View Author posts

1,009 posts since December 2010

Most read in Oracle

The Oracle posts our readers open most: the all-time favourites, and what is trending right now.

Leave a Comment

Your email address will not be published. Required fields are marked *